Project Description
Portions of Robleda-Burke evacuation route maintenance project represent a significant thoroughfare for the central Los Altos Hills Community. These roads serve as egress and ingress for local residents, daily commuters, and emergency services. To secure the egress / ingress’ integrity, the Los Altos Hills County Fire District proposes a roadside treatment of fuels.
Before & After Photos
Project Site
The Robleda-Burke project will treat six (6) roads along the evacuation route. These include Robleda Road, Chapin Road, Fremont Road, W. Edith Avenue, Burke Road, and Old Altos Road.
This project will treat the following sections of each road:
- Robleda Road from Elena Road to Fremont Road. Approximately 1.5 linear miles, 3.0 treated miles.
- Chapin Road from Robleda Road to Burke Road. Approximately 0.3 linear miles, 0.6 treated miles.
- Fremont Road from W. Edith Avenue to Burke Road. Approximately 0.43 linear miles, 0.86 treated miles.
- W. Edith Avenue from Fremont Road to University Avenue. Approximately 0.16 linear miles, 0.32 treated miles.
- Burke Road from Chapin Road to University Avenue. Approximately 0.44 linear miles, 0.88 treated miles.
- Old Altos Road from Burke Road to Fremont Road. Approximately 0.10 linear miles, 0.20 treated miles.
Total project area: 5.86 treated miles
Treatment History
2023 November Initial Treatment
The 2023 initial treatment of Robleda – Burke treated six (6) roadways:
- Robleda Road from Elena Road to Fremont Road
- Chapin Road from Robleda Road to Burke Road
- Fremont Road from W. Edith Avenue to Burke Road
- W. Edith Avenue from Fremont Road to University Avenue
- Burke Road from Chapin Road to University Avenue
- Old Altos Road from Burke Road to Fremont Road
- Project length: 5.86 treated miles
- View Final Report
2025 November Maintenance Treatment
The 2025 maintenance treatment of Robleda – Burke treated six (6) roadways:
- Robleda Road from Elena Road to Fremont Road
- Chapin Road from Robleda Road to Burke Road
- Fremont Road from W. Edith Avenue to Burke Road
- W. Edith Avenue from Fremont Road to University Avenue
- Burke Road from Chapin Road to University Avenue
- Old Altos Road from Burke Road to Fremont Road
- Project length: 5.86 treated miles
- View Final Report